Question No: 11

Your client’s network environment includes a Microsoft Visual Studio Team Foundation

Server (TFS) 2012) server installed at its main office. Branch offices have limited bandwidth connecting to the main office.

Client team members at one of the branch offices report that it is taking too long to retrieve files from source control.

You need to speed up the source control access for their most commonly accessed files. What should you do?

A.

  • Install a SQL server at the remote office and configure replication of the source control database from the main office to the SQL server at the remote office.

  • Install and configure a TFS proxy server at the remote office to use the replicated database.

  • Configure all the clients at the remote office to use the new proxy server

    B.

  • Install a new TFS instance at the remote office and configure it to sync with the main office.

  • Configure all the clients at the remote office to connect to the new TFS instance.

    C.

  • Install and configure a TFS proxy server at the remote office.

  • Configure all the clients at the remote office to use the new proxy server.

    D.

  • Install and configure a TFS proxy server at the remote office.

  • Run the TFSConfig.exe command to redirect remote users to the TFS proxy server based on IP address.

  • Install and configure a TFS proxy server at the remote office.

  • Run the TFS Admin Console command to redirect remote users to the TFS proxy server based on IP address.

    Answer: C

    Question No: 12

    Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Your TFS environment currently consists of a single team project collection (TPC) named DevTPC, one build controller named BC-1, and one build agent named BA-1.

    You need to create a separate TFS test environment by cloning your existing environment.

    You need to achieve this goal by utilizing as few new TFS services as possible.

    Which of the following diagrams shows the correct architecture for solving this problem?

    Dumps4Cert 2018 PDF and VCE

    1. Option A

    2. Option B

    3. Option C

    4. Option D

    Answer: C

    Question No: 13

    Your company uses a dual-tier deployment of Microsoft Visual Studio Team Foundation Server (TFS) that is integrated with the SQL Server Reporting Services.

    You are responsible for monitoring server health and performance. You notice a spike in CPU activity on the application tier.

    You need to determine the cause of the CPU activity.

    In which two locations should you look? Each correct answer presents part of the solution.

    1. the TFS administration console

    2. the TFS Command Log table

    3. the SQL Server Profiler

    4. the activity and job history log

    Answer: A,B

    Question No: 14

    Your organization uses a Microsoft Visual Studio Team Foundation Server (TFS) 2010 environment on a Windows Server 2008 R2 SP1 server.

    The Windows Server 2008 R2 SP1 server has a SQL Server 2008 R2 environment, as well as a Microsoft Office SharePoint Foundation 2010 environment. Your organization wants to perform an in-place upgrade to the 2013 version of TFS.

    You need to prepare the environment to meet the minimum requirements for the upgrade. What should you do?

    1. Upgrade SQL Server to SQL Server 2012 SP1.

    2. Add a test lab server.

    3. Upgrade the SharePoint Server to Microsoft Office SharePoint Server 2013, Enterprise edition.

    4. Upgrade all tiers to Windows Server 2012.

    Answer: C

    Explanation: http://msdn.microsoft.com/en-us/library/ff803410(v=vs.100).aspx

    Question No: 15

    Your network environment includes a multi-tier Microsoft Visual Studio Team Foundation

    Server (TFS) 2012 server implementation. Developers use Visual Studio 2012. Your team has just started developing a very large enterprise-scale application.

    You need to create a workspace for the new project that meets the following requirements:

    ->Developers should be able to use Visual Studio 2012 and earlier versions to work with the workspace.

    ->Performance of the workspace should not be degraded when the number of items

    in the workspace increases.

    ->The storage utilization of the developer local hard drive should be as minimal as possible.

    What should you do?

    1. Create a hybrid workspace.

    2. Create a server workspace.

    3. Create a server workspace and a Local workspace. Configure synchronization between both, and allow developers to utilize the local workspace.

    4. Create a local workspace.

    Answer: B

    Question No: 16 DRAG DROP

    You have a Microsoft Visual Studio Team Foundation Server (TFS) 2010. A new server is installed with Windows Server 2012 R2 Standard.

    You want to migrate TFS to the new hardware and upgrade it to TFS 2013. You install TFS 2013 on the new hardware.

    You need to complete the migration and upgrade.

    Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

    Dumps4Cert 2018 PDF and VCE

    Answer:

    Dumps4Cert 2018 PDF and VCE

    Explanation:

    Dumps4Cert 2018 PDF and VCE

    C:\Users\Kamran\Desktop\image.jpg

    http://msdn.microsoft.com/en-us/library/jj620930(v=vs.110).aspx

    Question No: 17

    Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server that uses default ports for communication. Visual Studio 2012 has been

    installed on your computer recently. You need to connect to the TFS server.

    What are two possible options for entering Name or URL in the Connect to TFS dialog box? (Each correct answer presents a complete solution. Choose two.)

    1. Tfs1

    2. http: //tfs1: 8080/tfs

    3. http: //tfs1: 8080

    4. http: //tfs1

    Answer: A,B

    Question No: 18

    Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server and Microsoft Lab Management (MLM) 2012.

    You need to create a new environment that will support the ability to include a snapshot of the environment in a bug report.

    Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)

    1. Create a standard environment.

    2. Set up Hyper-V virtual machines using a virtual disk.

    3. Create an SCVMM environment.

    4. Install a test agent on each box in the environment.

    5. Set up Hyper-V virtual machines using a physical disk.

    Answer: B,C

    Question No: 19

    Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Developers use Visual Studio 2012 to maintain a library of commercial

    .NET components provided for sale by your company.

    You release new versions quarterly and provide support for the four most recent versions. When issues are logged with previous versions it is time-consuming for your developers to locate and associate the correct version of debugging symbols and source code.

    You need to streamline the process for debugging prior versions of your library. What should you do?

    1. When it is time to deploy each quarterly update, copy the release binaries into version control.

    2. Within the build definition, set the Index Sources property to True and provide a path for the symbols. Add this path to the list of symbol file locations in Visual Studio when debugging that particular version.

    3. When it is time to deploy each quarterly update, label the source code with the version number being released.

    4. Enable IntelliTrace within Visual Studio. Within the build definition, set the IntelliTrace option to True.

    Answer: B

    Question No: 20

    Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Developers use Visual Studio 2012.

    You recently copied your existing TFS environment onto a new set of servers on the same network.

    You need to ensure that developers can continue connecting to the original TFS server. What should you do?

    1. Rename the new Team Project Collection to a unique name.

    2. Run the ChangeServerID command on the new TFS environment.

    3. Configure the Team Project Collections with the same name on the same network.

    4. Run the ChangeServerID command on the original TFS environment.

    Answer: B

    100% Dumps4cert Free Download!
    Download Free Demo:70-496 Demo PDF
    100% Dumps4cert Pass Guaranteed!
    70-496 Dumps

    Dumps4cert ExamCollection Testking
    Lowest Price Guarantee Yes No No
    Up-to-Dated Yes No No
    Real Questions Yes No No
    Explanation Yes No No
    PDF VCE Yes No No
    Free VCE Simulator Yes No No
    Instant Download Yes No No

  • Leave a Reply

    This site uses Akismet to reduce spam. Learn how your comment data is processed.